I need to reboot the master server, more updates. Hey membership is CHEAP for the last 10 years for a reason. Feel free to communicate and join us on Twitter.
On the upper chute
of the main
spillway, workers
continue to place
structural
concrete sidewalls
and install
epoxy-coated rebar
for concrete
slabs. Cr
(more)
On the upper chute of the main spillway, workers continue to place structural concrete sidewalls and install epoxy-coated rebar for concrete slabs. Crews continue covering underdrain piping with gravel between the hillside and the outer sidewalls. Roller-compacted concrete (RCC) continues to be placed on the southern half of the emergency spillway splashpad.